Taizhou Changlong Fasteners Co.,Ltd

enLanguage
Copper
video
Copper

Copper To Steel Dielectric Union Manufacturer

Maximum Pressure: 250psi.
Meet lead-free industry standards.
Made from different metals to help min corrosion.
Offer dielectric unions in a range of configurations, sizes, and materials.

Product Introduction

● Maximum Pressure: 250psi.

● Meet lead-free industry standards.

● Made from different metals to help min corrosion.

● Offer dielectric unions in a range of configurations, sizes, and materials.

No.

Description

Material

1

Union nut

Steel/zinc plated

2

Insulator

Platic

3

Tailpiece

Lead free brass

4

Gasket

EPDM

5

Union body

Steel/zinc plated

image001(001)


Product Parameter (Specification)

Item No.

Size

A

B

C

D

E

CLFFC008-1

1/2”

1.62

1.02

0.77

2.21

1.02

CLFFC008-2

3/4”

1.89

1.26

0.77

2.21

1.26

CLFFC008-3

1”

2.25

1.5

0.87

2.52

1.46

CLFFC008-4

1-1/4”

2.76

1.81

0.91

2.76

2.13

CLFFC008-5

1-1/2”

3.51

2.13

0.91

2.76

2.16

CLFFC008-6

2”

2

4.14

2.6

1.1

3.11

2


Products Details

image005(001) image007(001)

image009(001) image011(001)

image013(001) image015(001)


Product Qualification

● ISO9001 certified

● Our dielectric union is lead free and we have got Lead Free Certification

● Verified with weighted average lead content less than 0.25%

● UPC qualified

4

8

9


Factory Review

Our factory covers about 15000sqm, which the floor space is about 10000sqm. We have have hundreds of employees, including 16 managers and engineers. Our fixed assets valued about RMB15000000. There is an advanced production line, which collects the production step together, such as cold drawing, heat drawing, cutting, heat treatment and surface treatment.

The factory is specialized in producing a variety of high intensity particular fasteners. It mainly produces Dielectric Pipe Unions, pipe clamps and non-standard, irregular high intensity particular bolts and nuts.

image035

image037(001) image039(001)

image041(001) image043(001)


Deliver, Shipping and Serving

● Packing Details: 1pc/polybag+Carton or according to customer requirements.

● Delivery Details: usually about 25 days after receiving the deposite. Fast delivery requirements is acceptable.

● Shippment: usually by sea, if customer is in urgent need of the good, we can also deliver by air or by express like DHL, UPS Fedex etc.

5


FAQ

Q1: Are you a factory or a trading company?

A: We are a factory and have more than 20 years manufacturer and sales experience.

Q2: What certificate do you have?

A: ISO9001, Lead Free and UPC.

Q3: Can support OEM order?

A: Yes.

Q4: Samples are available before order?

A: Yes.


Latest News

6


You Might Also Like

(0/10)

clearall