Taizhou Changlong Fasteners Co.,Ltd

enLanguage
Plumbing
video
Plumbing

Plumbing Pipe Fitting Dielectric Union

Threaded end: FIP (Female Threaded)
Sweat End (Tail Piece): MT (male Copper Sweat)
Serve as a quick pipe union joint
Join and Release the pipes together quickly

Product Introduction

● Threaded end: FIP (Female Threaded)

● Sweat End (Tail Piece): MT (male Copper Sweat)

● Serve as a quick pipe union joint

● Join and Release the pipes together quickly

● To preserve the pipes for a longer period of time

No.

Description

Material

1

Union nut

Steel/zinc plated

2

Insulator

Platic

3

Tailpiece

Lead free brass

4

Gasket

EPDM

5

Union body

Steel/zinc plated

image001(001)


Product Parameter (Specification)

Female Iron Pip (+0.1~0.2mm)

Size

A

B

C

D

E

F

H

L

1/2

13.5

21.5

33.7

18.9

26

11.5

27

22.5

3/4

19.5

27.5

39.7

24.5

32

12

30

25

1

24.5

33.8

47.3

30.6

39

12.5

33

29

1-1/4

31.6

39.8

55.9

39.6

49

14

35

30

1-1/2

37.4

51.4

70.7

45.3

55

16

36

31

2

51

63.5

87.2

57.5

70

17

38

32.5


image003(001)


Male Copper End (+0.1~0.2mm)

Item No.

Size

A

B

C

D

E

F

G

CLFM012-1

1/2

28.5

10

2.5

14

27

21

20.8

CLFM012-2

3/4

30

12

2.5

18.3

31.5

26.4

25.5

CLFM012-3

1

32.5

13

2.5

25

38

32.7

31.8

CLFM012-4

1-1/4

34.8

13

2.7

31.5

52.4

45.7

40.5

CLFM012-5

1-1/2

36

13

3

36.2

69

61

46.6

CLFM012-6

2

38

15

3

47.5

69

62

58.6


image005(001)


Products Details

image009(001)

image013(001)

image017(001)


Product Qualification

● ISO9001 certified

● UPC qualified

● Our dielectric union is lead free and we have got Lead Free Certification


Factory Review

Our factory covers about 15000sqm, which the floor space is about 10000sqm. We have have hundreds of employees, including 16 managers and engineers. Our fixed assets valued about RMB15000000.

For production machine, we have 10 forging and pressing machines, 30 numerical control machines and 5 threading machines.

For detection equipment, we have 3 hardness detection machine.

All the machines and equipment are advance and completed.

image041(001)

image045(001)


Deliver, Shipping and Serving

● Packing Details: 1pc/poly bag+Carton or according to customer requirements.

● Delivery Details: about 4 weeks after receiving L/C or deposite copy we can accept fast delivery if customer is really in urgent.

● Shipment: by sea, by air or by courier like DHL, TNT and Fedex etc.

5


FAQ

Q1: What about the lead time for mass production?

Honestly, it depends on the order quantity and the season you place the order. Generally speaking, production lead time is within 30 days.

Q2: What's the product MOQ?

3000PCS.

Q3: Terms of payment?

We accept TT and L/C. TT is with 30% deposit, 70% against copy of BL.

Q4: What is your terms of delivery?

We accept EXW, FOB, CIF, DDU etc.

You can choose the one which is the most convenient or cost effective for you.


Latest News

6


You Might Also Like

(0/10)

clearall