Taizhou Changlong Fasteners Co.,Ltd

enLanguage
Steel
video
Steel

Steel Forged Machined Dome Ball Washer

We are forged products, better than casting products.
General material is 1045, we can do as your request.
General finish is zinc plated, we can do as your request.

Product Introduction

Product Introduction

● We are forged products, better than casting products.

● General material is 1045, we can do as your request.

● General finish is zinc plated, we can do as your request.

● Our goods is widely used in formwork, mining, tunneling and construction etc.


Product Parameter (Specification)

1

Item No.

#

d

DCH

max

min

max

min

max

min

CLDS020-1

6

6.6

6.4

12.5

12.07

3

2.75

CLDS020-2

8

8.6

8.4

17

16.57

4

3.7

CLDS020-3

10

10.74

10.5

21

20.48

4

3.7

CLDS020-4

12

13.24

13

24

23.48

5

4.7

CLDS020-5

16

17.24

17

30

29.48

6

5.7

CLDS020-6

20

21.28

21

37

36.38

6.6

6.24

CLDS020-7

24

25.28

25

44

43.38

9.6

9.24

CLDS020-8

30

31.34

31

56

55.26

9.8

9.44

CLDS020-9

36

37.34

37

66

65.26

12

11.57

CLDS020-10

42

43.34

43

78

77.26

16

15.57


Products Details

The dome ball washer is used in conjunction with the nut and the compatible dome plate. It assists in better alignment of the bolt and plate and maximising of load transfer.

4

image005(001) image013(001)


Product Qualification

● The factory has 20 years manufacturing and 15 years exporting experience, professional engineers and workers, the best machines, strict quality control system from the row material.

4


Production Procedure

555


Factory Review

Our factory covers about 15000sqm, which the floor space is about 10000sqm. We have have hundreds of employees, including 16 managers and engineers. Our fixed assets valued about RMB15000000. The tenet of the company: trive for survival on the basis if quality, take the market on the basis of reputation, welcome the customer on the basis of good service and develop in the basis of efforts.

10

11 12

13 14

15 16


Deliver, Shipping and Serving

● Packing Details: plywood pallets

● Lead-time: 20-30days

● Shipment: Ningbo port or shanghai port


FAQ

Q1: What is the normal lead-time?

A: 30 days.

Q2: What's your payment term?

A: L/C at sight or 30% T/T down payment and balance before shipping, it is negotiable.

Q3: Can I get the samples for free?

A: I could offer you free samples but with your freight cost.

Q4: Do you have official website?

A: Yes, www.clfasteners.com.


Latest News

6


You Might Also Like

(0/10)

clearall